+44 (0) 116 271 6861
Location

Central London

Type of building

UK Parliament building containing the House of Commons and House of Lords

Number of levels

One basement level

Date of commissioning

2018

Category
  • Smoke Control
Type of system

Smoke control system with 9 zones, each zone acting as a control level and extract system

Equipment installed

Large extract fans, ductwork, comfort ventilation system to two zones. Hi>Protect control with master and slave control panels.

Want to work with us?

Get in touch

Case Study

Palace of Westminster

Advanced Smoke Group were asked to install a smoke ventilation system serving a basement services area below the Palace of Westminster buildings. This involved a series of tunnel areas split into nine fire zones. One of the most challenging aspects of the work was actually transporting the large fans through very restricted spaces, in one case, having to split the fan assembly down in order to access the area.

Need advice on a project?