London
Central London railway terminus
2 levels
April 2017
No controls duct work installation, special project
Installation of fire rated Durasteel duct work
Want to work with us?
Get in touchAs licenced Durasteel installers, Advanced Smoke Group secured the contract to install the fire rated ductwork at high level above the trains using the new Elizabeth Line.
Need advice on a project?
The refurbishment of the Blackwall Tunnel involved the replacement of the original outdated and inadequate ventilation system
As licenced Durasteel installers, Advanced Smoke Group secured the contract to install the fire rated ductwork at high level above the trains using the new Elizabeth Line.