Location

London

Type of building

Central London railway terminus

Number of levels

2 levels

Date of commissioning

April 2017

Category
  • Special Projects
Type of system

No controls duct work installation, special project

Equipment installed

Installation of fire rated Durasteel duct work

Want to work with us?

Get in touch

Case Study

Paddington station

As licenced Durasteel installers, Advanced Smoke Group secured the contract to install the fire rated ductwork at high level above the trains using the new Elizabeth Line.