Location

London

Type of building

12 x multi-storey residential apartment blocks

Number of levels

Variable 8-15 storey Blocks

Date of commissioning

Phased installation with commissioning 2015 - 2022

Category
  • Smoke Control
Type of system

Smoke control system incorporating Hi.Protect "comfort vent"

Equipment installed

Multiple Control Panels, HMI Control centre, Fireman’s override switches, Hi.Protect folding arm actuators, AOV-F Smoke shaft dampers, Stairwell fire dampers, AOV stairwell ventilators with trickle vent side pods, Smoke detectors, Smoke extract fan sets, Smoke shaft terminals with trickle vent side pods

Want to work with us?

Get in touch

Case Study

Fulham Reach Residential Apartment Blocks

The Fulham Reach building project is an extremely large development demanding a multi phased construction program. Each of the apartment blocks has its own dedicated smoke control system. Due to high temperature pipework passing through the common corridor ceiling void, a means of ventilating those corridors and reducing the air temperature within them was necessary. A creative approach was adopted to use the normally closed smoke ventilation system to provide cooling fresh air to those areas. The use of the smoke control fans for this “day to day” ventilation scheme gave the added benefit to the smoke extract fans in that they were less likely to suffer brinelling of the motor shafts and therefore had improved reliability for functioning in an emergency.