Greenwich
Tunnel
Single
Phased 2015 – 2017
4 x powered extract turrets for pollution & smoke ventilation
4 number x 8.50m diameter circular turrets, each with six individually motorized “petal” blades which operate sequentially. The turret blades power open upon a fire or carbon monoxide signal from the tunnel monitoring system.
All controls by Advanced Smoke Group and each turret has its own independent control panel and field wiring.
Want to work with us?
Get in touchThe refurbishment of the Blackwall Tunnel involved the replacement of the original outdated and inadequate ventilation system. The replacement scheme required the installation of four 8.5m diameter automatic ventilators. Each ventilator was powered by four 1250mm diameter extract fans and the ventilator blades so large they had to each had to be linked to a geared system powered by large three phase motors. The automatic ventilators are believed to be the largest “AOV’s ever built.
Need advice on a project?
The refurbishment of the Blackwall Tunnel involved the replacement of the original outdated and inadequate ventilation system
As licenced Durasteel installers, Advanced Smoke Group secured the contract to install the fire rated ductwork at high level above the trains using the new Elizabeth Line.